Another great installation of our equipment by the team at Essential Energy, who upgraded there 22kV Ripple Control Plant at Bourke in the far north-west of New South Wales on the south bank of the Darling River. This will ensure reliable control of peak load for many more years to come.
top of page
Outdoor and indoor, AC & DC, Load break and make, Vacuum breaking
Outdoor and indoor, AC & DC, Load break and make, Vacuum breaking
Outdoor and indoor, AC & DC, Load break and make, Vacuum breaking
Live Line Insulators
Cable, pipe and line entries
bottom of page
留言